How Long Does It Take to Build a Pool in Jacksonville, FL?

Custom concrete pool and spa with sun shelf in Jacksonville backyard

If you’re considering a backyard pool in Jacksonville, one of the first questions most homeowners ask is simple:

How long does it take to build a pool?

The answer depends on your property, design, and permitting process — but most custom inground pools in the Jacksonville area take several months from planning to swim-ready.

Below, we’ll walk you through what a realistic pool construction timeline looks like in Jacksonville and what factors can speed it up or slow it down.


The pool building timeline in Jacksonville: what to expect

A custom pool project typically moves through three major stages:

  1. Design and planning

  2. Permitting and preparation

  3. Construction

Each phase plays an important role in creating a smooth, safe, and long-lasting pool. At Southern Elegance Pools, we follow a clear, step-by-step approach so you always know what comes next — from planning and design through permitting and construction. Learn more about our full custom pool construction process here.


1. Design and planning phase (2–6 weeks)

3D rendering Jacksonville Inground Pool Large SunShelf

This is where your project takes shape.

During the design phase, you’ll work with your pool builder to:

  • Evaluate your backyard and access points

  • Choose a pool style, size, and layout

  • Select features such as sun shelves, spas, lighting, and automation

  • Review finishes like tile, coping, and decking

  • Develop construction drawings

In Jacksonville, factors such as lot layout, drainage, utilities, and setbacks can all influence design decisions. Taking the time to plan properly often prevents costly changes later.


2. Engineering, permitting, and pre-construction (4–10+ weeks)

This stage is often the longest part of the timeline.

Before construction can begin, your project may go through:

  • Engineering review

  • Permit submittals and approvals

  • Utility coordination

  • Site preparation

Permit timelines in Jacksonville can vary based on:

  • the time of year

  • the scope of the project

  • city and county workloads

  • whether revisions are required

While this phase happens mostly behind the scenes, it’s critical. Proper permitting ensures your pool meets safety, structural, and building requirements before any excavation begins.


3. Construction phase (8–16+ weeks on average)

Swimming Pool Interior Jacksonville Inground Pool

Once permits are approved, physical construction begins.

A typical pool build includes:

  • Layout and excavation

  • Structural steel installation

  • Plumbing and electrical work

  • Pool shell installation

  • Inspections

  • Tile and coping

  • Decking and hardscapes

  • Equipment setup

  • Interior finish

  • Startup and final walkthrough

Some stages move quickly, while others depend on inspections, weather, and material scheduling.

Jacksonville’s climate allows for year-round construction, but rain patterns and summer storms can sometimes impact timelines.


What can make a Jacksonville pool take longer?

Several factors can extend a pool build:

  • Permit backlogs

  • Design changes after plans are submitted

  • Larger or more complex pool designs

  • Limited backyard access

  • Weather delays

  • Specialty materials with longer lead times

Every property is different, which is why timelines are always estimates rather than guarantees.


What helps a project move faster?

Homeowners can often help keep projects on track by:

  • Making finish selections early

  • Responding quickly to design questions

  • Avoiding major plan changes mid-process

  • Preparing the yard for equipment access

  • Working with an experienced local pool builder

Clear communication and early planning make a big difference.


So, how long does it really take?

Most Jacksonville homeowners can expect:

  • Several weeks for planning and design

  • One to two (or more) months for permitting

  • Two to four months for construction

Altogether, most custom pool projects take several months from start to finish.


Jacksonville vs. beach-area pool timelines

While this guide focuses on Jacksonville, pool timelines in coastal communities can differ due to permitting processes and property considerations.

👉 Read our Ponte Vedra Beach pool construction timeline here

If you’re ready to understand exactly how your pool project will unfold from start to finish, you can also explore our full custom pool construction process.


Why working with a Jacksonville-based pool builder matters

Local experience plays a major role in keeping projects efficient.

A builder familiar with Jacksonville understands:

  • local permitting departments

  • drainage and soil conditions

  • inspection processes

  • seasonal construction patterns

That knowledge helps avoid delays and unexpected complications.


Thinking about building a pool?

If you’re planning a custom inground pool in Jacksonville, the best first step is a professional site evaluation and design consultation.

It’s the easiest way to receive a realistic timeline, project outline, and next steps for your specific property.


Frequently Asked Questions

 

How long does it take to build a pool in Jacksonville, FL?

Most projects take several months total, including design, permitting, and construction.


Can I speed up the pool building process?

Choosing finishes early, responding quickly to questions, and working with a local builder can help reduce avoidable delays.


Does Jacksonville allow pool construction year-round?

Yes, but rain and seasonal weather patterns can still impact scheduling.


Do permits slow down pool construction?

Permitting is often the longest stage of the process, but it ensures safety, code compliance, and long-term durability.